13294301831         |

成功案例

当前位置:首页>成功案例

    Reconstruction Project of a Water Treatment Plant in Heilongjiang Province 

    发布时间:2019-03-11

    Reconstruction project of a water purification plant in Heilongjiang Province

    Raw water: river water

    Raw water turbidity: 150-300NTU

    Water volume: 10000m3/d

    Outlet water of sedimentation tank before transformation: 20NTU

    Filtered water: 15NTU

    Effluent from the reformed sedimentation tank: 3NTU

    Filtered water: ≤ 1NTU

     

        The original process is ordinary grid flocculation+ordinary inclined tube sedimentation, which is transformed by our company's high-density micro vortex flocculation sedimentation and clarification technology, that is, the original tank structure remains unchanged, all the original grid inclined tubes are removed, hydraulic classification and layout are re conducted in the tank, and high-density micro vortex mixing equipment, high-density micro vortex flocculation equipment and high-density micro vortex sedimentation equipment are replaced. After transformation, the water quality fully meets the national drinking water standard, The water output is increased by 20% and the operation is stable.

网站地图(xml / html
 
QQ在线咨询
售前咨询热线
13294301831
售后咨询热线
13294301831