Power Plant Project of a Mine Project in Jinchuan, Indonesia
Power Plant Project of a Mine Project in Jinchuan, Indonesia
Raw water: waste water from ash yard
Water treatment capacity: 2 × 300t/h
Raw water turbidity: ≤ 200NTU
Effluent turbidity: ≤ 5NTU
The laterite nickel mine project invested by Jinchuan Group is listed by the National Development and Reform Commission as a key international production capacity cooperation project between the Chinese and Indonesian governments under the "the Belt and Road" initiative, with a planned investment of 658 million dollars.
The installed capacity of the project is three 220t/h high-temperature and high-pressure coal-fired circulating fluidized bed boilers+three 50MW high-temperature and high-pressure condensing steam turbine generator units. The waste water from the ash yard of the power plant is recycled using our company's proprietary technology "high-density micro vortex flocculation sedimentation clarification water treatment technology". The effluent after sedimentation is 5NTU, and the quality of the effluent is stable.